Saturday, June 6, 2015

Back in Thailand

While i was still in the states Don was in Boat Lagoon getting the yacht ready for replacing our old engine for a new engine. It has not been easy getting all the work done on the re powering. With a language barrier and not having the right tools to do the job, Don has had to show alot of patience to get the job done right. While i was gone Don was able to rent us alittle apt in walking distance of the boat. With all the work being done inside there is no room for me to work so i spend alot of time at the apt. Luckily it is air conditioned, because it is extremely hot here in Phuket. These are just a few pictures of the work being done. We hope to be out of here by mid July. The work is very slow going.

Rejoining Don at Boat Lagoon.
Taking old engine out.

Out and sitting in the companionway.

Taking some of the bulk head to make room for getting the engine out.


New engine  waiting to be installed.


Still waiting.


In but not totally, getting their. She sure is pretty

In the mean time Solstice is not just getting a new engine, she is getting a new face lift, top to bottom.

After scraping all the old paint off the sand by hand.

These are so me of the guys working on the engine.


Don and the contactor for  the new paint job. 

New cushions


No comments:

Post a Comment